Joined
·
1,218 Posts
This pic of a PCC turnaround in DC shows the turns could get pretty tight -http://www.davesrailpix.com/dct/jpg/ehd037.jpg
Also note the center trough power pick up which was used inside the District. The trolley would switch to overhead line when they got to the suburbs.
-Brian
Also note the center trough power pick up which was used inside the District. The trolley would switch to overhead line when they got to the suburbs.
-Brian