I'm planning on making some 1:20 scale quarrying machinery.
The channelling machine was self propelled on tracks.
I saw some O scale code 100 track at a show that i think would
be about right. In the quarries ties were not used but the rails were bolted to and separated by a truss made of heavy steel rod. The length of track would be about 2 feet or alittle less. Where would you by this track?
The channelling machine was self propelled on tracks.
I saw some O scale code 100 track at a show that i think would
be about right. In the quarries ties were not used but the rails were bolted to and separated by a truss made of heavy steel rod. The length of track would be about 2 feet or alittle less. Where would you by this track?