G Scale Model Train Forum banner
1 - 1 of 1 Posts

· Premium Member
Joined
·
477 Posts
Hi Doc,
I'm with Rockwood on this one.
Consider stone, concrete, etc walls and culverts with infill for all three tracks to pass on a common grade.
probably better looking than three bridges that close together.

A length of 4"round pvc sewer line tripled up would probably pass all the water needed to drain your layout unless your in a monsoonal climate.
Just my thoughts
Rick Marty
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top