G Scale Model Train Forum banner
1 - 1 of 1 Posts

· Premium Member
Joined
·
35 Posts
Another suggestion would be to use a Culvert, using two or three two inch drainage pipes to carry the water under the track, and using concrete to create the culvert, these types are very common on our Australian Railways.

I consider these tracks are too close together to have individual bridges.
 
1 - 1 of 1 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top