G Scale Model Train Forum banner

1 - 3 of 3 Posts

·
Registered
Joined
·
4 Posts
Discussion Starter · #1 ·
APRIL FOOLS!!!! The attached pics show what I use for releveling the 200' of mainline track along with a 30' passing siding and 30' staging track on my NP Garden Railroad. My roadbed is roughly 4" deep of crusher dust. With the winter frost and heaving and lowering. It only takes me about an hour to do it in spring and I might do it again in midsummer. MOW-2 is on the production schedule. It will be a gondola which will hold my 6" level for super elevation around my 12' radius curves. Greetings from Green Bay, Wis. USA. Have a great spring nd summer
 

Attachments

·
Premium Member
Joined
·
2,780 Posts
By the looks of it, I think that they need to send a crew out to get some of those spikes hammered down a little.
Great looking trestle.
Happy Easter,
David Leech, Delta, Canada
 
1 - 3 of 3 Posts
Top