G Scale Model Train Forum banner
1 - 4 of 4 Posts

·
Premium Member
Joined
·
82 Posts
Discussion Starter · #1 ·
Finally started on the Garden rr by putting in a pond and 2 water falls. pond is 6ftx9ft(liner type), upper pond is a preformed 3x3, water fall at top was a rock pool i got last fall. I dug out the lower pool 8 inches deep Sunday afteernoon from 3:30-5:00Befor doing that I washed and scrubbed the main deck with Bleach and Wisk.then barbequed ribs, son and gkids came for dinner.
Monday I sprayed thompson water seal on the deck and railing and steps, then laid Irrigation line along east side of deck and placed colored cement lawn edging along it, then dugout the pond the rest of the way, son came over so I had him help me place the liner and then filled it with water. Today i had to do some tweaking around the liner(filled in 1 corner by lifting edge of liner up and shoveling sand under the corner to make a ledge and a small depression for the upper pond to pour onto to get waterfall sound). Then placed upper pond on mound of dirt from digging pond and also placed the rock pool above that. Then raked and leveled dirt i had thrown around to fill low spots along edge and in garden. Also have another mound of dirt from the pond that I will make a tunnel thu for the RR. here are some pics of it plus they also show flowers and plants that I put in last fall. The 2 trees in bloom are flowering Crabs.
Sundays work

Mondays work

porch swing

waterfalling(Pink&White flowers r Creeping Phlox)

distant shot
 

·
Premium Member
Joined
·
82 Posts
Discussion Starter · #7 ·
Bill we just had our cement driveway removed today and I had them haul 2 of the slabs(broken into pieces big and small) of concrete near the ponds. there is enough conrete to cover all edges of the lower pond,upper pond, and the mountain.
 

·
Premium Member
Joined
·
82 Posts
Discussion Starter · #9 ·
Yesterday and today I placed broken concrete around the edge of lower pond and around upper pond and waterfall. Still have a large piece to split up but broke the old handle on the stone sledge hammer. Pics of it and rest of concrete pieces. will use rest of concrete inside the mountain and tunnel. i also have red sedum to plant in between pices of concrete around the ponds. will do that am tomorrow
facing north

facing SW(will have a two track tunnel under the deck)
 
1 - 4 of 4 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top