G Scale Model Train Forum banner
1 - 9 of 9 Posts

· Premium Member
Joined
·
299 Posts
Discussion Starter · #1 ·
Winter is over and construction for the new siding at the tool shed has begun. As the sun sets in the West, a couple or retired fishermen, from the old country, Billy the Crab and  Hector Haddock, sit on the platform passing some time in conversation .

I needed to drag the building and platform outside in order to cut back the juniper, without cutting it back too much.
 

· Old Senior Member
Joined
·
1,543 Posts
Very nice work.. Realy look right in place... Got anymore photos of your crane?? I built a few of them and one for the River Barge but like to have one for my Frt. truck termial. You have a very nice size crane for an open dock. Tks for sharing. Noel
 

· Premium Member
Joined
·
299 Posts
Discussion Starter · #9 ·
Thanks guys.
The buliding went back inside while I finished the excavation, foundation work and rock wall.  SIte prep is done and as soon as I get back from the ECLSTS I'l' be able to place it outside for the season.
 
1 - 9 of 9 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top