G Scale Model Train Forum banner
1 - 2 of 2 Posts

·
Premium Member
Joined
·
834 Posts
Discussion Starter · #1 ·
I have decided to go with PVC roadbed and bend my own track etc. This is my 1st 10' curve (pretty close) and I have it screwed to level stakes. As you can see dirt @ the top of the circle is low and the bottom side is high where I had to dig it out to get level.

1. Should I just dig a trench under the PVC and fill with AG lime (original plan)? I am concerned about the ballast washing out on the sides into town etc. Therefore...
2. Has anyone used any type of edging to contain the ballast? A friend of mine used that black plastic garden edging and it worked great until it heaved...
3. Turnouts! In the pic you see one planned... the WR 10' switch from Aristo, isn't the curved part of the switch a 10' Diameter and couldn't it be used in the circle with the straight part of the turnout being the siding? Plan to use a left turnout in the picture etc.
4. I would like to match brown Euro ties with turnouts, Does Aristo offer these?

Sorry for so many questions but I thought numbering them would help. Trying to wrap up a coouple track questions in one thread here.

Thanks!
 

·
Premium Member
Joined
·
834 Posts
Discussion Starter · #4 ·
Yes they are cheap stakes, but I plan to use them only as a reference. After the track is laid and ballasted... unscrew the PVC from the stakes or just let them rot...?
 
1 - 2 of 2 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top