G Scale Model Train Forum banner
1 - 1 of 21 Posts

· Premium Member
Joined
·
2,143 Posts
C.T. mentioned rivet construction. That idea has a lot of merit. It allows for some very high detail and prototype appearance. You would be dealing with flat stock and angle which is not too bad. Kalmbach has a number of pubs out on bridges, some would be way cool. Rivet work is very easy, just a lot of it.

Bob
 
1 - 1 of 21 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top