Joined
·
268 Posts
Being new to LS, I 'just found' out about Paul Huntington.
"
Ok, he had been building LS for 25+ years.
"
Some of you may have seen his work in the Nov/Dec 07 SITG.
But for others, I thought I would share some of his work.
Here is one example of "As delivered with Sky Line Caseing
and Smoke Deflector (Elephant Ears)" B&M Pacific.
Only the pressure gauge and wheel castings are 'store bought'
and he built everything else.
Boiler is a Martin Evans design 2"x1', 0-40psi in 4 min.,
runs for ~30 min with a 1/2" Bore with 7/8" Stroke.
Ok, he had been building LS for 25+ years.
Some of you may have seen his work in the Nov/Dec 07 SITG.
But for others, I thought I would share some of his work.
Here is one example of "As delivered with Sky Line Caseing
and Smoke Deflector (Elephant Ears)" B&M Pacific.
Only the pressure gauge and wheel castings are 'store bought'
and he built everything else.
Boiler is a Martin Evans design 2"x1', 0-40psi in 4 min.,
runs for ~30 min with a 1/2" Bore with 7/8" Stroke.