G Scale Model Train Forum banner

1 - 7 of 7 Posts

·
Premium Member
Joined
·
1,062 Posts
Discussion Starter #1
I'am putting a piko western rio grande water tower #62210 together. I have the water tower meaning the top part that holds the water together but now i am having trouble attaching the top part of  the water tower to the bottom part. Are there any suggestion on how to get all of the legs lined up to fit into the holes of the bottom part of the water tower. I keep trying to getting all of the pieces lined up but it's not happening. I keep trying to get them lined up but no matter how load i yell at the s.o.b.s they won't lister. I need help before i break something.:mad::mad::mad::mad:
 

·
Premium Member
Joined
·
4,716 Posts
I'd glare at them over my glasses.
 

·
Master of Disaster
Joined
·
867 Posts
For the time being....put it away for a couple of days THEN go back to it with your mind clear, and free of fustration...this works for me and lets me problem solve any given problem better.

If it came in the box it has to fit...maybe something is reversed or quite possibly upside down....none the less to correctly problem solve.... pictures would help us understand a little better.

We are all willing to help.

Bubba 
 

·
Premium Member
Joined
·
1,062 Posts
Discussion Starter #7
The upside down worked. As soon as we get it all together i will post a picture. Thanks for the replies/DesktopModules/NTForums/themes/mls/emoticons/hehe.gif
 
1 - 7 of 7 Posts
Top