Its in the files someplace, but after building a number of switches to fit.
I placed the filler track in tonight after work.
YOU WILL STILL NEED TO BE VERY CAREFUL WALKING AT THE GRADE CROSSING
THERE IS NO NEED TO WALK IN THE YARD AREA, YOU CAN CROSS OVER AT EACH END OR ,,, FACE BEING ,,,SHOT.
I need to do some straightening and adjusting because the end of the concrete pour did not turn out well. shimming will fix that.
Spike (the cat) was checking it out. The two center tracks is the mains. you can see left the line going to the High Line. Also the switch going to the old steam up bay.
Next is the north end to build.
Its in the files someplace, but after building a number of switches to fit.
I placed the filler track in tonight after work.

YOU WILL STILL NEED TO BE VERY CAREFUL WALKING AT THE GRADE CROSSING
THERE IS NO NEED TO WALK IN THE YARD AREA, YOU CAN CROSS OVER AT EACH END OR ,,, FACE BEING ,,,SHOT.
I need to do some straightening and adjusting because the end of the concrete pour did not turn out well. shimming will fix that.
Spike (the cat) was checking it out. The two center tracks is the mains. you can see left the line going to the High Line. Also the switch going to the old steam up bay.
Next is the north end to build.