G
Guest
·Guest
Joined
·
0 Posts
enlightened by the multi gauge turnout thread, for my bridge i made a simple joiner for double track.
just half a 30° crossing and some bent pieces of rail.
does anybody see a reason, why this should not work?
(apart from two trains entering the bridge from opposite sides...)
just half a 30° crossing and some bent pieces of rail.
does anybody see a reason, why this should not work?
(apart from two trains entering the bridge from opposite sides...)