I was working on the stucco for the canyon when I ran into a color problem It may be I was using a liquid color and didn't shake the bottle enough
I went to another project changing another 10 ft curve to a 20 ft.
I had to change a approach to the tunnels. This is where I removed the gurder bridges.
I had to select some rocks from the herd
I put them in place
Then I fill in with a load of dirt
Then I added some concrete road bed.
This time the space was wide and I did not have anthing 12 inches long or more.
So I used stakes to hold the forms in place
Stakes were used on the inside and outside of the forms to keep them in place
I went to another project changing another 10 ft curve to a 20 ft.
I had to change a approach to the tunnels. This is where I removed the gurder bridges.
I had to select some rocks from the herd
I put them in place
Then I fill in with a load of dirt
Then I added some concrete road bed.
This time the space was wide and I did not have anthing 12 inches long or more.
So I used stakes to hold the forms in place
Stakes were used on the inside and outside of the forms to keep them in place