Joined
·
528 Posts
Lift out/lift up bridges can be left, usually accidentally, in the open position when running trains. I don't have a bridge of these types but if I did I would make sure that the track sections either side if the bridge were de-energised when the bridge was in the open position - avoiding a possible wreck.
This applies only to track powered guys of course: how the battery folk manage only they can tell.
This applies only to track powered guys of course: how the battery folk manage only they can tell.