Joined
·
54 Posts
After DH09 I made a new box shaped fuel tank that gives me 2 hours of burner time. It is constructed with .100" thick plate steel and welded. I made a new fuel control valve that mounts to the bottom of the tender. It has a blade drive, the same as the hand pump. I moved the link pin holes down 10mm on the hand pump which made it possible the shorten the pump handle. A disc was added to operate the direction shaft. Now one tool does it all, and fits in my pocket.
With the fuel control relocated, I patched the front of the tender.
The hand pump access cover was hinged with Accucraft foot plate hinges.
I shortened and moved the tender drain to hide it behind the lower tool boxes.

With the fuel control relocated, I patched the front of the tender.

The hand pump access cover was hinged with Accucraft foot plate hinges.

I shortened and moved the tender drain to hide it behind the lower tool boxes.
