Dear all
We have made 2 small youtoube films today. This will give you an idea of how much track there have been laid since last time.
In both films a Aster Schools Class pull the camera-waggon.
The layout is not totally finished, and we still have a few bumps on the tracks. We hope to fix them, when the weather improves.
Moreover the frost makes the engine spin from time to time.
The films shows the general layout, and you can easy follow our idea behind the design.
There are 2 testruns
1. (Highspeed run, 4 min): http://www.youtube.com/watch?v=WmfFVotl1SU&feature=channel_pagehttp://www.youtube.com/watch?v=QbRGBmNDol8
2. (Slow 7 min): http://www.youtube.com/watch?v=IuweDJ5do58&feature=channel_page
If you have any comments to the film or good advice regarding the final phases in the construction. Please drop me a line.
All imputs are very welcome.
Best Regards
David Clement, Denmark
We have made 2 small youtoube films today. This will give you an idea of how much track there have been laid since last time.
In both films a Aster Schools Class pull the camera-waggon.
The layout is not totally finished, and we still have a few bumps on the tracks. We hope to fix them, when the weather improves.
Moreover the frost makes the engine spin from time to time.
The films shows the general layout, and you can easy follow our idea behind the design.
There are 2 testruns
1. (Highspeed run, 4 min): http://www.youtube.com/watch?v=WmfFVotl1SU&feature=channel_pagehttp://www.youtube.com/watch?v=QbRGBmNDol8
2. (Slow 7 min): http://www.youtube.com/watch?v=IuweDJ5do58&feature=channel_page
If you have any comments to the film or good advice regarding the final phases in the construction. Please drop me a line.
All imputs are very welcome.
Best Regards
David Clement, Denmark