We had to remove the bad dryrotted pier and boat float this spring at Butthead Cove. We figure we would build a new 3 foot PVC pier with a small boat float along side of it. We have a Remote Tug and 4 foot Barge with crane to off load supplies to the fishing village.
This is the first stage of Butthead Cove Fishing Villiage.
We got the rest of the forms in today and this Sat. will start cementing in and around the tracks. Tracks will be in a ditch with fine gravel laid in to equal the level with the cement pad, this is where most of the fishing buildings are going to be on both sides of the tracks...
The pier is sitting upside down on the bridges to the right that has PVC tubing sticking out of it. This pier will attach on to the cemented pad area, kind of like an extention to that area.
All of the electrical piping is also in. Well start cement work Sat. due to a hard area to get to and have to transport cement via across the pond by buckets...
Here is a photo of the old pier.
Another old photo link...
http://1stclass.mylargescale.com/no...C-629F.JPG
Photos of todays work...
More photos.
More photo links.
http://1stclass.mylargescale.com/noelw/Butthead%20Cove%20Pier/SN854138.JPG
http://1stclass.mylargescale.com/no...854140.JPG
http://1stclass.mylargescale.com/no...854141.JPG
To the right of this Village we installed a pump house and Maint. pier two weeks ago. This pumps water to three streams.
Sorry. can't find a photo of the pumphouse right now.
One stream goes to the Grist mill slouse box and trough/ditch.
Here is a photo of the Grist Mill that is done.
Another stream goes along side of a light house on the other side of the koi pond.
We will try to keep updating until this project is done.. We also have some animation to install in the fishing village.
Hope you like what we are trying to do..
This is the first stage of Butthead Cove Fishing Villiage.
We got the rest of the forms in today and this Sat. will start cementing in and around the tracks. Tracks will be in a ditch with fine gravel laid in to equal the level with the cement pad, this is where most of the fishing buildings are going to be on both sides of the tracks...
The pier is sitting upside down on the bridges to the right that has PVC tubing sticking out of it. This pier will attach on to the cemented pad area, kind of like an extention to that area.
All of the electrical piping is also in. Well start cement work Sat. due to a hard area to get to and have to transport cement via across the pond by buckets...
Here is a photo of the old pier.
Another old photo link...
http://1stclass.mylargescale.com/no...C-629F.JPG
Photos of todays work...
More photos.
More photo links.
http://1stclass.mylargescale.com/noelw/Butthead%20Cove%20Pier/SN854138.JPG
http://1stclass.mylargescale.com/no...854140.JPG
http://1stclass.mylargescale.com/no...854141.JPG
To the right of this Village we installed a pump house and Maint. pier two weeks ago. This pumps water to three streams.
Sorry. can't find a photo of the pumphouse right now.
One stream goes to the Grist mill slouse box and trough/ditch.
Here is a photo of the Grist Mill that is done.

Another stream goes along side of a light house on the other side of the koi pond.
We will try to keep updating until this project is done.. We also have some animation to install in the fishing village.
Hope you like what we are trying to do..