Decal

 | 

Sunday, November 23, 2008   You Are Here: Forums

 


Subject: Portable layout building log - reduex
Prev Next
You are not authorized to post a reply.
Page 1 of 212 > >>
AuthorMessages
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/21/2008 10:11 AM  
Well lets see, its been about a year since I started this thing, maybe I should try to finish this stupid thing BEFORE this years BTS :O



I work better under pressure anyways... ;)

I started building up the blue foam "hills" last week, getting near the top now, be ready to start carving the foam into rocks pretty quick here, lets see...

...I got 47 days to go! :D

link to original building log:whistling:

http://archive.mylargescale.com/forum/topic.asp?TOPIC_ID=47038&SearchTerms=portable,layout,log

Kitbashing, welcome to the Dark Side
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/21/2008 8:59 PM  
Progress pics:


Starting with the foam

backside view

foam topped off

Now gotta wait for the glue to dry, then I can start shaping.:laugh:



Kitbashing, welcome to the Dark Side
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/22/2008 9:21 PM  
One evenings carving, not bad, starting to look like southwestern sandstone:)




Still need to sand some of the rough spots down and carve the back side a bit but this was very very fast!

Kitbashing, welcome to the Dark Side
blackburn49User is Offline
1st Class Member
Copper Center, Alaska
Engineer
Engineer
Posts:1855

Send Message
04/22/2008 11:02 PM  
Posted By vsmith on 04/22/2008 9:21 PM

 

Still need to sand some of the rough spots down and carve the back side a bit but this was very very fast . . . 



 I like it ! Great little project you have going there. What are you using for the glue?



vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/23/2008 8:47 AM  
Its Just standard carpenters glue, most things I've read say use "Liquid Nails" because it dries faster, but I have a big thing of the carpenters glue. I just glue it down the night before and its ready to go the next evening. But cold weather can effect its drying time. If time or weather are issues, use the Liquid nails route.

PS I watched this series of vids on Youtube, it was very helpfull.

http://youtube.com/watch?v=D1D4KBB_GC4&feature=related




Kitbashing, welcome to the Dark Side
blackburn49User is Offline
1st Class Member
Copper Center, Alaska
Engineer
Engineer
Posts:1855

Send Message
04/23/2008 11:55 AM  
Posted By vsmith on 04/23/2008 8:47 AM

Its Just standard carpenters glue, most things I've read say use "Liquid Nails" because it dries faster, but I have a big thing of the carpenters glue. I just glue it down the night before and its ready to go the next evening. But cold weather can effect its drying time. If time or weather are issues, use the Liquid nails route. PS I watched this series of vids on Youtube, it was very helpfull.http://youtube.com/watch?v=D1D4KBB_GC4&feature=related



Yes, cold weather is ALWAYS an issue up here, so liquid nails it is. Thanks for the advice.



vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/26/2008 4:33 PM  
Progress:

the buildings on top are just there for ideas, I'm still deciding what I want to do there. The Piko buildings may be OK but the HofB hotel looms a little large, I really want to build a series of very narrow buildngs winding there way up the hill, so these would only be temporary anyway. Even the station would eventually be replaced. But I only have a little over one month to get this ready.

Kitbashing, welcome to the Dark Side
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/28/2008 9:27 PM  

Small test area for scenery, Woodland Scenics stuff, guess it works for large scale, no ballast yet, gotta get some stuff without the blue "ore" in it.

Photo came out to bright, it doesnt look this washed out in person :confused:

Kitbashing, welcome to the Dark Side
Dwight EnnisUser is Offline
Moderator
Milpitas, CA
Engineer
Engineer
Posts:1473

Send Message
04/28/2008 10:01 PM  
It's looking good Vic!! Nice little module!


Dwight Ennis
Milpitas, CA
SA #21

http://www.SantaCruzLumberCo.com

vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/29/2008 11:34 PM  
A tad more progress









Kitbashing, welcome to the Dark Side
steam makerUser is Offline

Brakeman
Brakeman
Posts:39

Send Message
04/30/2008 8:50 AM  
Now that is cool. Nice job!
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
04/30/2008 9:55 AM  
Thanks, I added highlight colors to the bluffs on the layout as shown above. Going to go with 3 facades at the top with the watertank as shown, and the "house of relief" next to the water tank (eeewww!):O

Got a bag of "Ballast" in the pet aisle of the local Theftway.... dam stuff has pink "scent control crystals" in it, another had blue ones, geez well at least pink looks more southwesterny than blue.:pinch:

I think if I had one full day I could finish this, fat chance I'll have that kind of free time :tongue:

Kitbashing, welcome to the Dark Side
VillageRailUser is Offline

Foreman
Foreman
Posts:104

Send Message
05/02/2008 9:57 AM  
I have a friend building an giant HO scale railroad in his attack. Something like you might see at a train show. Only problem is he's been working on it for years and he still doesn't even have a single working loop to run the trains. I keep telling him to get one section going so I can see some of the hundreds of trains actually running. The mountains have been evolving for about two years now but still need landscaping. He did finally manage to finish a large stockyard, so I got to see some very nice locos move back and forth about 20 feet. Now its filled with a couple hundred boxcars. I'm pretty sure he's ADHD. ;-)

Once you put your mind to it, you came a long way in a very short time. The mountains turned out very nice. I hope you post some pics when you figure out how to work the structures in. Good work!

Paul
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
05/02/2008 11:03 AM  
Yikes! First thing I did on my indoor layout was track wiring and controls, gotta get them running otherwise its just a great big paperwight. Even if it takes me a couple years to finish it, I can still run trains anytime I want, and thats whats most important for me.

Put down a small section of my ballast as a test, Yuck!

The white kitty litter looks like crap! After vacuuming that disaster off, thought I was gonna dye!

Literally! I dyed the litter, using some rust brown paint mixed with water, and dipped the litter with a stainer into it and set it out to dry. Color looks alot better now. We'll see how dry it is tonight, might need to bake it in the oven to get it nice and crispy. If this works I'm going to use it on the indoor layout, beats paying $10 a paltry bag for the Woodland Scenics stuff, much as I like it, on a layout my size, it would cost a small fortune to ballast that way.

Kitbashing, welcome to the Dark Side
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
05/04/2008 9:17 PM  
Well a hard push this weekend squeezing time in between yardwork and chores, yields results, I give you

Tincan Junction

Overall view


Station looking up the hill


Looking up the hill from the crossing


View of Brien's Pinnacle


Tincan itself, a one horse town and they had to borrow the horse.

Still lots of little detail stuff to add, I thought this would take another month to do but it went surprisingly fast, I'm ready for the BTS.

BTW this is a full dress rehersal for the big indoor layout.

Kitbashing, welcome to the Dark Side
Ed HarveyUser is Offline

Lincoln, Nebraska
Foreman
Foreman
Posts:167

Send Message
05/05/2008 12:24 PM  
I see from the first photo of your last post (above this one) that you've included an large wind turbine to provide power to the layout. Very environmentally friendly. ;)


Ed Harvey & Carol Rogers
Lincoln, Nebraska
http://www.snr.unl.edu/harvey/railroad.htm
tmejiaUser is Offline
1st Class Member
Southern California
Foreman
Foreman
Posts:136

Send Message
05/05/2008 12:39 PM  
Vic,

That is looking outstanding. Looking forward to seeing it in person (Like in about 1 month).

Tommy:cool:
Rio Gracie
GlacierBillUser is Offline
1st Class Member
South Sioux City, Nebraska
Brakeman
Brakeman
Posts:63

Send Message
05/06/2008 6:17 PM  
Love the layout, what is the diameter of that turn?

(Deleted duplicate reply, SteveC mod.)

The light at the end of the tunnel may be that of an on coming train.
GlacierBill
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
05/06/2008 7:12 PM  
Thanks guys
Bill its a 36" diameter, bent down from 5' brass rails and spiked to basswood ties, the link in the first post will take you to the 1st part of the building log that explains most of the early trackwork to get the stage of the first post above here.

(edit) OOPS! FYI to GlacierBill, its a 36 x 36 base, with a 32" dia center to center track.
:blush:

Kitbashing, welcome to the Dark Side
vsmithUser is Offline
1st Class Member
SoCal
Engineer
Engineer
Posts:1000

Send Message
06/12/2008 9:16 AM  
Update, a friend took some video of the layout at the BTS last weekend

http://youtube.com/watch?v=yxrimi_8bNo&feature=user

Sorry for the dark picture, the light inside that place always plays havoc with all sorts of cameras

BTS display 2008:


Kitbashing, welcome to the Dark Side
You are not authorized to post a reply.
Page 1 of 212 > >>

Forums > Forums > Indoor Railways > Portable layout building log - reduex



ActiveForums 3.7
Terms Of Use | Copyright 2007 by myLargescale.com/Model Railroads Online, LLC  | Privacy Statement