StAubins

 | 

Thursday, November 20, 2008   You Are Here: Forums

 


Subject: summer project update
Forum sponsored by PCGRS
Forum Sponsored By: PCGRS
 
Prev Next
You are not authorized to post a reply.
AuthorMessages
tom hUser is Offline
1st Class Member
Mokena, IL
Foreman
Foreman
Posts:112

Send Message
08/06/2008 7:02 PM  
I had to change the bottom of my layout, I took the fines out, and if you notice I will lay down the flat rocks, then I will lay a conveyor belt( ¾ in thick) on top of the rocks, then I will build towers from cedar fencing strips I cut up. I have a fencing company that I get all kinds of cedar from. On top of the towers (they wont be very high, maybe 8-12 in at the tallest) I will run cedar 1 in strips between towers to hold up the tracks, its to level out the grade which is very steep. I wanted to make the bottom of my layout a little different, when I raise the track through the tunnel I will close the openings so it looks better, I have read a lot of posts about keeping the wood above ground, and this works for me, everything I get is free, which fits my budget.


What to do with all that cedar fencing I got, got about 50 pieces, not used yet, since I had to find a place for the fines, I thought I would use it for the base for my buildings, and a road, all I had to do was rip the boards to 2.5 in, and nail them together, and to extend my path a little, I will lay down weed blocker and fill the wood base with fines, and put decorative rock around everything


This will be my Industrial area, I have another base to put in and maybe another.

This is my first thing I did, this will be my fuel depot, just have to glue and paint my tanks and letter them and put it in the base, because I had grey fence stain it worked real well to look like it was surrounded by concrete, so it looked like containment walls.

I have to lay my wire down and put my rocks down, will take more pics after I lay everything out, already made more roadbed and another base, just waiting for the 1st coat so I can put on another one.

Sorry for the long post!
Tom h

leonpeteUser is Offline
1st Class Member
Holstein, IA.
Foreman
Foreman
Posts:181

Send Message
08/06/2008 7:54 PM  
Railroad is looking good Tom. Lot of work , but fun work!! Keep us posted on your progress.

THE B&L RAILROAD
HOLSTEIN, IA.
LEON PETERSON
blackburn49User is Offline
1st Class Member
Copper Center, Alaska
Engineer
Engineer
Posts:1855

Send Message
08/06/2008 8:57 PM  
I see you're off to a good start !



You are not authorized to post a reply.
Forums > Forums > Public Forum > summer project update



ActiveForums 3.7
Terms Of Use | Copyright 2007 by myLargescale.com/Model Railroads Online, LLC  | Privacy Statement