s-4 1st Class Member New Hampshire
 Passenger Posts:7
Send Message
 | | 07/19/2008 8:35 PM |
| Yesterday the state of NH ran a work train over the recently abandoned Rockwall Canyon RR Route. This was the first train over the RCRR in nearly 8 months. The run was operated to cut back overgrowth and to repair track damage keeping the line serviceable for future railroad operations. Service over Rockwall Canyon was suspended several months after the Boraxo plant moved out of town. Boraxo was one of RCRR's last weekly customers, the building has already been demolished.
| | The Rockwall Canyon RR Web site: http://1stclass.mylargescale.com/s-4/a%20rcrrhome.htm | |
|
blackburn49 1st Class Member Copper Center, Alaska
 Engineer Posts:1807
Send Message
 | | 07/19/2008 10:34 PM |
| Very nice layout. Good storyline too. It does appear to be an abandoned rail.  | |

| |
|
Richard Smith 1st Class Member Port Orford, Oregon
 Foreman Posts:380
 Send Message
 | | 07/19/2008 11:15 PM |
| | Nice shots! How long is that run? It looks like it goes for a considerable way. Fine looking railroad and I've always liked that C&NW paint job. | |
 | |
|
s-4 1st Class Member New Hampshire
 Passenger Posts:7
Send Message
 | | 07/20/2008 3:06 PM |
| Thanks for the comments guys! The railroad is located at my parents house about 15 minutes away from my new condo. Since we have common land at the condo, I can not, and do not want to build a new garden railway. Instead, I have built a huge HO layout in my basement and I've kept my garden railroad at my parent's place. I thought I would have more opportunity to untilize my outdoor layout, but over the last year and half, I've only run trains about 10 times.
The layout is about 1000ft long and has an elevation change of about 15ft. While I sold off some of my equipment, I hope to retain the majority of my railroad for a future pike on my own land! For now, I will try to keep things running occaisionally on the RCRR. | | The Rockwall Canyon RR Web site: http://1stclass.mylargescale.com/s-4/a%20rcrrhome.htm | |
|
denray 1st Class Member
 Foreman Posts:176
Send Message
 | | 07/20/2008 4:52 PM |
| Great pictures, can sure tell you have put some seious thought in the changes in elevation. I know with that much change,you must do some serious planning. Tell us about your bridges, what are they made of. Great job Dennis | | | |
|
suleski 1st Class Member Amesbury, MA
 Brakeman Posts:51
 Send Message
 | | 07/22/2008 4:02 AM |
| Jeff - Its good to see that you are still running some trains. I had thought the RCRR was defunct, glad it still sees a train every now and then.
Scott | | Scott Suleski Suleski Transportation, Inc. www.suleskitransportation.com www.nhgrs.com | |
|
N1CW 1st Class Member Central Mass.
 Brakeman Posts:32
 Send Message
 | | 07/22/2008 5:26 AM |
| Scott
I bet that Jeff has determined that his HO train will not be able to 'handle the tonnage' in the near term. I would expect that he will need to sub-contract some tankers from CapeAnnRail for the liquid refreshment. | | The_Other_Ray
Ground Pounder on the Gil-Ray_R.R. ......Northern Terminus of the..... WEAKNEE and AIKENBACK RR System. | |
|
Torby 1st Class Member North Chicago 'burbs.
 Engineer Posts:1441
 Send Message
 | | 07/22/2008 7:02 AM |
| | Man, that's purdy! | |
  Chicago Marathon You don't have to train or run, I'm taking care of that for you. | |
|
s-4 1st Class Member New Hampshire
 Passenger Posts:7
Send Message
 | | 07/23/2008 7:03 PM |
| Dennis, The railroad is about 1000ft long with reverse loops on each end. The typical gradient on the main line is 4%. It's a steep rocky grade that required 6 back and forth passes to reach the peak. There are also 2 single helix loops that gain altitude in especially tough spots. I built nearly all of this railroad between the age of 14 and 18 while working weekends at a hobby shop! (I worked elsewhere during the week, but that $ wasn't for the train fund haha)
Scott, Nice to see your still in the rail scene as well. You sure have quite the fleet of plows! I'll have to see about coming down to Larry's again sometime...or perhaps we could meet up on my pike.
Ray, How's the RS3 and RDC's treating ya? Not sure about liquid refreshment via tank car, Aristo has those special warnings on their packaging now haha. Maybe they only apply in California.
Torby, Thanks! | | The Rockwall Canyon RR Web site: http://1stclass.mylargescale.com/s-4/a%20rcrrhome.htm | |
|
lvmosher 1st Class Member
 Brakeman Posts:74
 Send Message
 | | 07/24/2008 7:31 AM |
| Woww ! I thought you'd left the country Jeff. Glad you're still out there Next chance at my house is Sunday the 3rd of August ..8AM | |  Larry "http://www.capeannrail.com" | |
|
blackburn49 1st Class Member Copper Center, Alaska
 Engineer Posts:1807
Send Message
 | | 07/24/2008 11:23 AM |
| The railroad is about 1000ft long with reverse loops on each end. The typical gradient on the main line is 4%. It's a steep rocky grade that required 6 back and forth passes to reach the peak. There are also 2 single helix loops that gain altitude in especially tough spots. I built nearly all of this railroad between the age of 14 and 18 while working weekends at a hobby shop! (I worked elsewhere during the week, but that $ wasn't for the train fund haha)    Very, very impressive. You (obviously) really put a lot of time, thought and care in this layout. I can honestly state without reservation that it is a first rate job. My regards, Ron | |

| |
|
N1CW 1st Class Member Central Mass.
 Brakeman Posts:32
 Send Message
 | | 07/26/2008 7:10 AM |
| Jeff With my elevated flat track, I exchanged the B&M RS-3 10amp Airwire Rcvr with a 3amp QSI sound card and transplanted the 10amp and a bigger battery into the B&M RDC-1. Now I have sound in the RS-3 and pulling power in the point RDC-1's.
Are you counting-down-the-days yet? | | The_Other_Ray
Ground Pounder on the Gil-Ray_R.R. ......Northern Terminus of the..... WEAKNEE and AIKENBACK RR System. | |
|
s-4 1st Class Member New Hampshire
 Passenger Posts:7
Send Message
 | | 08/02/2008 9:42 AM |
| Thanks Ron, I appreciate the kind words! A good railroad's never finsihed...this one's just in transition for a couple years!
Ray, A 3 amp board is perfect for that little RS3! Having sound must be nice too...gotta love that unique Alco rumble! I always loved working the ALCO S-4 up in North Conway... That loco would make the most amazing smoke before it warmed up. haha The engine shed was usually unihabitable for about a 1/2 hour after it left! (That's why they call them honorary steam engines)
Speaking of North Conway...have you heard that they now own an ex-NH RDC now? It is fully operational with two detroit diesels and full A/C. They've only used it a couple times so far, but i guess it runs well. Might be worth checking out the Conway Scenic RR Railfan's weekend this year!...Typically the Saturday is the most active.
Oh...and yes! About a month and 1/2 to go! | | The Rockwall Canyon RR Web site: http://1stclass.mylargescale.com/s-4/a%20rcrrhome.htm | |
|
NTCGRR 1st Class Member Nebraska City NE
 Conductor Posts:671
 Send Message
 | | 08/03/2008 3:33 PM |
| | I've always loved you canyon wall area, have you thought of GMM catwalks on that brdige w/o the railings? | |
 Marty Cozad North Table Creek GRR Nebraska City, NE
Is it "REAL" or just 1:29 th | |
|
joe rusz 1st Class Member
 Foreman Posts:208
Send Message
 | | 08/03/2008 3:48 PM |
| | A very nice railroad. Plus your lead shot had me wondering if it was real or Memorex...or Cozad. Anyway, I sure would love to have that much land to play with! | | | |
|