iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/27/2008 4:26 PM  
After 4 years living in this house, I've started my garden railroad. The following pictures show my progress.

Spring 2008.



The beginning of July 2008. I added some retaining wall timbers and some wooden edging.



Saturday July 26, 2008. I had 5 yards of dirt dumped on my driveway and moved about 1 1/2 yards by wheelbarrow by myself while my 18 year old son hung out with friends. 90 degree temps and 85 degree humidity.





Sunday July 27, 2008. I woke my son up at 8 AM, he wasn't happy. Enough back breaking work yesterday, so I rent a walk behind skid loader. So much easier.



I started to lay out the track plan and found out that I mis calculated, so had to make some quick layout changes.





White string indicates the location of the pond. We're also going to have a stream running from the corner of the retaining wall over top of the 2 curve section. Both curve sections will be tunnels.



I'll update the pictures as the work continues.
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/27/2008 4:28 PM  
Don't know what happened to my pictures. I'll have to try again.
toddalinUser is Offline

Foreman
Foreman
Posts:406

Send Message
07/27/2008 4:31 PM  
you need to put a / before the img at the end of the pic.

[/img]
toddalinUser is Offline

Foreman
Foreman
Posts:406

Send Message
07/27/2008 4:33 PM  
Posted By iowafarmboy1960 on 07/27/2008 4:26 PM
After 4 years living in this house, I've started my garden railroad. The following pictures show my progress.
Spring 2008.

The beginning of July 2008. I added some retaining wall timbers and some wooden edging.

Saturday July 26, 2008. I had 5 yards of dirt dumped on my driveway and moved about 1 1/2 yards by wheelbarrow by myself while my 18 year old son hung out with friends. 90 degree temps and 85 degree humidity.


Sunday July 27, 2008. I woke my son up at 8 AM, he wasn't happy. Enough back breaking work yesterday, so I rent a walk behind skid loader. So much easier.

I started to lay out the track plan and found out that I mis calculated, so had to make some quick layout changes.


White string indicates the location of the pond. We're also going to have a stream running from the corner of the retaining wall over top of the 2 curve section. Both curve sections will be tunnels.

I'll update the pictures as the work continues.
Jerry BarnesUser is Offline
1st Class Member
Lexington, NE
Conductor
Conductor
Posts:976

Send Message
07/27/2008 7:54 PM  
Looking good. The walk behind skid loader was a good idea! Jerry

Life is too short to take seriously.
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/27/2008 8:26 PM  
Toddalin,

Thanks for fixing my screw up with the pictures. I haven't post pictures on the site for quite awhile.

Tom
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/27/2008 8:29 PM  
I guess I didn't notice that the last 2 pics are the same. Here's the pic of where the pond will go.



TorbyUser is Offline
1st Class Member
North Chicago 'burbs.
Engineer
Engineer
Posts:1666

Send Message
07/28/2008 6:23 AM  
Nice work!

"If Christianity was something we were making up, of course we could make it easier. But it is not. We cannot compete, in simplicity with people who are inventing religions. How could we? We are dealing with Fact. Of course anyone can be simple if he has no facts to bother about."-- C. S. Lewis
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/28/2008 8:45 AM  
Here's a picture of the track plan using RR Track


jimtypUser is Offline
1st Class Member
Centennial, CO
Conductor
Conductor
Posts:720

Send Message
07/28/2008 9:19 AM  
Looking good IFB! The pond, stream and tunnels will really add a lot. There's a pic in the latest Garden Railway that I really like the look of the stream. Are you planning a trestle or bridge for the crossover? What sort of grade are expecting?

livin' la vida loco
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/28/2008 10:48 AM  
I have a 2' pony truss bridge for the crossover and a 3' truss bridge for over the pond. The grades will be 3.6% from the switch to the crossover and 3.8% from the crossover to the entrance of the lower tunnel. The lower tunnel starts at the 1st straight track before the curve closest to the tree.

Tom
toddalinUser is Offline

Foreman
Foreman
Posts:406

Send Message
07/28/2008 11:01 AM  
An Iowa farm boy..., Hmmmm...,

You wouldn't happen to be Captain James T. Kirk now would you? :wow:
jimtypUser is Offline
1st Class Member
Centennial, CO
Conductor
Conductor
Posts:720

Send Message
07/28/2008 11:09 AM  
Tom, looks like you have done your homework :-)

One more question, and I ask because I want to do something similar with a pond and stream some day, will you have a holding tank so when the water from the stream is turned off the pond does not overflow, or will you leave enough room in the pond so that it can hold the stream water as well?


livin' la vida loco
vsmithUser is Offline
1st Class Member
SoCal
Conductor
Conductor
Posts:996

Send Message
07/28/2008 12:23 PM  
It looks like your using your existing topography to your benifit, you will still have a stiff grade from the looks of it, but niothing that cant be delt with.

Whats your minimum radius/diameter curves?

Kitbashing, welcome to the Dark Side
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/28/2008 1:33 PM  
The minimum radius is 5', 1 by the pond & the other between the tree and the shed. Everything else is 8' with a few 5 footer here and there. I'm planning on running my bachmann 4-6-0 and my lgb 2-4-0. Tom
vsmithUser is Offline
1st Class Member
SoCal
Conductor
Conductor
Posts:996

Send Message
07/28/2008 3:28 PM  
5' radius? Are you sure of your designations, 5' radius = 10' diameter, 8' radius = 16' diameter, I ask because it looks like the curve at the tree would be 5' diameter, I just want to be sure were talking about the same apples here, its very easy to get confused on the whole radius/diameter thingy :P

Kitbashing, welcome to the Dark Side
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/28/2008 6:31 PM  
The smallest is 5', 6.5', & 8' foot diameter curves. I'm just going to running my steam engines on this layout. I have F3's, but the rest of my diesels are too big. I had plans to build a much bigger layout, but decided I better start off small with the first layout. Here's a couple of pics of where the big layout is suppose to go.





But as you can see, the retaining wall isn't finished. It's looked like that for 3 1/2 years now.
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
07/28/2008 6:35 PM  
And of course the pictures didn't show up again. I don't know what I'm doing wrong.
Semper VaporoUser is Offline
1st Class Member
Cedar Rapids, Iowa
Engineer
Engineer
Posts:1226

Send Message
07/28/2008 6:39 PM  
Posted By iowafarmboy1960 on 07/28/2008 6:31 PM
The smallest is 5', 6.5', & 8' foot diameter curves. I'm just going to running my steam engines on this layout. I have F3's, but the rest of my diesels are too big. I had plans to build a much bigger layout, but decided I better start off small with the first layout. Here's a couple of pics of where the big layout is suppose to go.


But as you can see, the retaining wall isn't finished. It's looked like that for 3 1/2 years now.




No closing square bracket on the last tag.

C. T. McCullough
Cedar Rapids, Iowa
SA #37469
iowafarmboy1960User is Offline
1st Class Member
Brakeman
Brakeman
Posts:32

Send Message
08/11/2008 5:39 PM  
Worked on the railroad again the weekend. Friday I dug out the location for the first tunnel.






Saturday there were 2 open houses for 2 members of the MGRS. I got a couple of ideas for making the tunnel. Neither one panned out and I decided to go with concrete. Here's a couple of pics for the progress that I made today. I got the floor of the tunnel poured.












Tom
You are not authorized to post a reply.
Page 1 of 3123 > >>

Forums > Forums > Beginner's Forum > Garden railroad finally started



ActiveForums 3.7
Terms Of Use | Copyright 2007 by myLargescale.com/Model Railroads Online, LLC  | Privacy Statement