PCGRS

 | 

Wednesday, August 20, 2008   You Are Here: Forums

 

Subject: Another milestone on the In-ko-pah RR
Forum sponsored by PCGRS
Forum Sponsored By: PCGRS
 
Prev Next
You are not authorized to post a reply.
AuthorMessages
Argument 'Length' must be greater or equal to zero.
Ray DunakinUser is Offline

Sandy Eggo
Brakeman
Brakeman
Posts:37

Send Message
05/07/2008 10:46 PM  
Last night I finally connected the last sections of mainline track!!! Not quite a "golden spike" moment though, as there are two places where the track is suspended over the canyon sans bridge. Until those two bridges are in, I still won't be able to run trains over the entire route.

They will both be stone arch bridges, larger than any I have attempted so far. I also have to construct some miniature retaining walls to support the track in a couple of spots closest to the edge of the layout. I'll do the walls first, then the bridges.

After the mainline is operating, there is still one passing track to install and a couple of sidings.

BTW, last Saturday three fellow garden railroaders came by to see the layout after attending the convention in AZ. Greg Elmassian, R. J. DeBerg, and Ted Doskaris. Real nice guys, and I greatly enjoyed their visit. Nice to finally meet RJ and Ted in person. I've previously meet Greg at a couple of the local club meetings.

blackburn49User is Offline
1st Class Member
Copper Center, south central Alaska
Engineer
Engineer
Posts:1673

Send Message
05/08/2008 10:17 AM  
Posted By Ray Dunakin on 05/07/2008 10:46 PM

Last night I finally connected the last sections of mainline track!!! Not quite a "golden spike" moment though. . . 



Yes, I sure know that feeling ! I am in the process of connecting up my own final 96-foot elevated segment as well. This will enable me to properly operate my Phase II outdoor mainline.  It will be a big moment. Congratulations for you are definitely in order.
Ray DunakinUser is Offline

Sandy Eggo
Brakeman
Brakeman
Posts:37

Send Message
05/08/2008 10:29 AM  
I considered using temporary plank bridges but due to the circumstances of the terrain I'd have to construct abutments and supports that wouldn't be used on the permanent structures. So I decided to just skip it and go straight into construction of the bridges.
blackburn49User is Offline
1st Class Member
Copper Center, south central Alaska
Engineer
Engineer
Posts:1673

Send Message
05/08/2008 10:50 AM  
Posted By Ray Dunakin on 05/08/2008 10:29 AM

I considered using temporary plank bridges but due to the circumstances of the terrain I'd have to construct abutments and supports that wouldn't be used on the permanent structures. So I decided to just skip it and go straight into construction of the bridges.




Ray, I hope you don't mind. I took the liberty of pulling one of your pictures from your website so our members could once again see what a beautiful job you are doing within a very small area. Your work really is stunning.  I went looking for the trackplan, but, regrettably, you have not yet posted one.

Ray DunakinUser is Offline

Sandy Eggo
Brakeman
Brakeman
Posts:37

Send Message
05/08/2008 12:42 PM  
Thanks! And no, I don't mind you posting the pic. I still haven't gotten around to drawing up the track plan.

Greg ElmassianUser is Offline
1st Class Member
Carlsbad (San Diego), CA
Conductor
Conductor
Posts:765

Send Message
05/08/2008 1:54 PM  
Ted Doskaris, R.J. DeBerg and I visited Ray's last weekend. We had a blast and I will tell you that the pictures, as good as they are, do not do justice to his layout. I took a few of some more unusual details, and I'll post a couple on my website and link them here on Sunday.

The attention to detail is very high, and when you just stare at one area, you keep seeing more and more. For example, in the lower right corner of the above picture is a mine opening that will be enhanced in the future with buildings, people, etc. This kind of detail is sprinkled all through the layout!

Ray's layout is like a long folded dogbone, and it zigzag's left to right from the bottom to the top. He does not run the 2 tracks next to each other all the time, so it's not apparent what connects to what, a great plan.

So, you see this enormous "wall" sloping away from you just covered with track and bridges. We tried to count the number of them, and we think it's about 22. It was not easy!


Regards, Greg


Be sure to visit my site, lots of technical tips and modifications, and you can search for topics and key words.
Click here for Greg's web site
tbugUser is Offline
1st Class Member
Brakeman
Brakeman
Posts:91

Send Message
05/09/2008 3:20 PM  
Extremely nice layout!!!
Greg ElmassianUser is Offline
1st Class Member
Carlsbad (San Diego), CA
Conductor
Conductor
Posts:765

Send Message
05/12/2008 2:15 PM  
The pictures I took are here:
http://www.elmassian.com/index.php?option=com_content&view=article&id=249&Itemid=291
Regards, Greg


Be sure to visit my site, lots of technical tips and modifications, and you can search for topics and key words.
Click here for Greg's web site
Ray DunakinUser is Offline

Sandy Eggo
Brakeman
Brakeman
Posts:37

Send Message
05/12/2008 9:28 PM  
Those pics turned out great, Greg! I really like the close up shot of the ocotillo. It's interesting to see the layout through someone else's eyes, gives me a whole new perspective.

blackburn49User is Offline
1st Class Member
Copper Center, south central Alaska
Engineer
Engineer
Posts:1673

Send Message
05/12/2008 11:14 PM  
If I were living in the states where I could have a real garden railway and then I saw those pictures of that rock-garden model railroad, I probably be tempted to tear mine all up and start over. That one is really inspirational.  
docwatsonvaUser is Offline
1st Class Member
Hendersonville, NC
Brakeman
Brakeman
Posts:81

Send Message
05/14/2008 5:40 AM  
Ray,

What a fantastic layout. It shows an incredible amount of imagination to fit a layout into what most people would consider an impossible area for a garden railroad.

I have a question. I noticed you have at least one curved girder bridge. Would you be so kind as to relate how it was constructed and on what radius? Thanks.

Doc
TorbyUser is Offline
1st Class Member
North Chicago 'burbs.
Engineer
Engineer
Posts:1256

Send Message
05/14/2008 7:06 AM  
And people wonder what to do with a slope!


Chicago Marathon You don't have to train or run, I'm taking care of that for you.
Ray DunakinUser is Offline

Sandy Eggo
Brakeman
Brakeman
Posts:37

Send Message
05/14/2008 11:34 AM  
The "curved" plate girder bridge is actually composed of four short, straight sections joined together at an angle. Getting the angle right was more of a pain than I thought it would be. I actually had to add small spacers between the sections, on one side, to get it right.

The materials are the same as my plate girder bridges: I used 1/8" thick G10 fiberglass for the sides, and Plastuct styrene shapes for the braces. The interior and undersides are not detailed.


Ray DunakinUser is Offline

Sandy Eggo
Brakeman
Brakeman
Posts:37

Send Message
05/14/2008 11:35 AM  
Oh, and the track on the bridge is 4 foot radius.
aceinsppUser is Offline

Foreman
Foreman
Posts:217

Send Message
05/15/2008 11:52 AM  
Ray sure was a perfect host. As Greg and others have said the pics really do not do the RR real justice. Seeing in person was the tip of the ice burg. Thanks again Ray for the opertunity to view such a work of art, and one fine looking RR. Later RJD


RJD Chief Engr D & S RR
You are not authorized to post a reply.
Forums > Forums > Public Forum > Another milestone on the In-ko-pah RR



ActiveForums 3.7
Terms Of Use | Copyright 2007 by myLargescale.com/Model Railroads Online, LLC  | Privacy Statement