Well, a few things have been done so far, but not a whole lot of progress yet.
I did all the Plumbing before the Great Train Expo a few weeks ago. The only bit of Plumbing left to do is the Compressor work, but since the Compressor is not mounted yet, seems rather silly to do it until I can mount the Compressor. I added the Firemans side injector, which for me, being the first time working on an Injector on a model, was a challenge, but it came out pretty good I think. would like to find a way to model the Water Feed lines from the tender, but still be able to seperate the two parts of the locomotive for transport.
I ended up creating new Branch pipes for both sides, it was just easier to do, plus the Firemans side one has to feed into the Injector mounted ahead of the cab, so it required a custom fit.
I also have my Decals for "Georgetown Loop RR" so as soon as the repainting work is done, 14 will come to life!
So here are a few shots of the current progress.
Tender Lettering Removed (with a slight ghost still visible, did that on purpose)
Cab lettering removed, along with patches to the Firebox, and domes. The Stack and Firebox are sporting their new colors, which is a close match to the Proper Graphite/Silver Mixture we are using on WSL 9 at the Loop. Helps to have the real thing to reference.
Firemans side injector
New Sanding Lines to match what is found on 14, along with at closer look at the stack color
Engineers side view. Engine Sets were removed for painting
Dynamo close up
New Air Compressor. Westinghouse Cross-Compound. Its not mounted, just sitting on the running boards, I have a few things I need to change before it goes on, and the smokebox needs to get painted.
Front View